Crystal Bay Condominiums

A complete exterior renovation including removal and replacement of the wall covering system (EIFS) with stucco, waterproofing balconies, complete reroofing, site drainage, and new landscaping.

Project Cost: $1,900,000
Before Construction
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
Temporary shoring is installed to prevent the balconies from collapsing.
EIFS damage at the Porte-Cochere due to extensive water intrusion.
Large area of the 1st floor removed to investigate the extent of damage.
Demolition Phase
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
Close up of damage in one of the investigational core cuts.
Overview of damage and rot
found in an entire section.
Surface rust and damage metal framing on the porte-cochere.
Framing & Sheathing Phase
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
New framing and batten insulation. Over 1,800 sq. ft. of insulation was replaced.
Newly reconstructed section.
Framing the new balconies.
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
Heavy equipment is used during construction. Installation of plywood sheathing. Overview of reconstruction at the back of the building.
Balcony Phase
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
All old materials were removed and new framing installed. Completed flashing system. Completed waterproofing system.
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
Screen enclosure is installed. Completed railing system. Note
the new scupper drains.
Completed section of screen enclosures, decorative railing and downspouts.
Roofing Phase
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
All existing plywood sheathing is removed.
Standing seam metal roof panels are installed.
Completed metal roof system.
Stucco Phase
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
Scaffolding system is constructed (north side).
Stucco and paper backed lath is
installed to all exterior walls.
Balcony area is prepared to receive the new stucco system.
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
Base coat of stucco is applied. Windows and doors are protected
during stucco installation.
Stucco texture application.
Waterproofing Phase
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
Base coat (white) and topcoat (tan) installation.
Cleaning and sealing the exterior stucco system expansion joints.
Completed waterproofing system.
Landscaping Phase
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
Rear of building before the grading work begins.
The re-grading at the rear of the building. Existing grade was lowered 6” - 8”
New sprinkler lines and valves are installed.
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
Overview of new landscaping and sod. Completed landscaping and French drain system at the rear of the building. Overview of new landscaping and sod.
Completed Renovations
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
roofing, construction, st petersburg, largo, tampa florida
Overview of new landscaping and sod.
Completed landscaping and French
drain system at the rear of the building.
Overview of new landscaping and sod.


©2002 TarHeel Roofing, Inc. All Rights reserved.
Bonded • Licensed • Insured • State Certified #CCC023542
Steel framing is erected and attached to the substrate. Sprayed polyurethane foam is used to seal the new penetrations, keeping the existing structure watertight during construction. Overview of new steel framing, west side Overview of new steel framing, south side Overview of new steel framing, north side Overview of new steel framing, east side